Friday, October 23, 2009

House To Do List

Left to do
  1. Finish edge painting our bedroom
  2. Fix all drips and draps on ceiling
  3. Paint computer room 
  4. Finish the spare bedroom
  5. Edge the hall and living room
  6. Finish coating cabinets ~ almost done
  7. Lay board where planter was
  8. Replace all cabinets ~ most done
  9. Hang curtain in spare bedroom
  10. Change all light switch covers
  11. Paint inside all closets
  12. Assemble the mailbox
  13. New flooring throughout ~ KITCHEN DONE
  14. Paint basement entry walls
  15. Install shelf under bathroom sink
  16. Hang curtains in kitchen, bathroom, living room,office and our bedroom
  17. Get baskets for kitchen
  18. Radon system to be installed ~ tues
  19. Shop vac basement
  20. Drylock basement
  21. Hang closet extender
  22. Hang broom organizer (this thing turned out to be a piece of ... so we are buying something else)
  23. Cut all bushes at side entrance
  24. Get molding for kitchen 
  25. move wood to basement
  26. Cut tree limb that is blocking computer room window
  27. Sensor light outside
  28. Hang BB Wallpaper finished on cabinets
Oh ... PACK our current house and MOVE it...
...and the big one... BREATHE!

1 comment:

  1. Geesh! Your list looks like mine only mine doesn't have much crossed off, lol!!

    ReplyDelete

Your comments mean so much to me!
Thank You!~ Patricia